You are here: Home » Resources » News&Blog/Press Release » Custom Magnetics Case Studies » EFD30 Transformer Production: From Automated Winding to Final Quality Release

EFD30 Transformer Production: From Automated Winding to Final Quality Release

Views: 0     Author: Site Editor     Publish Time: 2026-08-19      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
snapchat sharing button
telegram sharing button
sharethis sharing button

EFD30_Final_Inspection_and_Release_Process_副本_01.png

 

Automated Output Still Requires

Controlled Checkpoints

Automated winding supports repeatable, high-volume output,

but it does not complete the quality assurance process.

After winding, units move through controlled transfer,

electrical verification, visual inspection, tape-layer

verification, marking confirmation and protective packing.

EFD30_Final_Inspection_and_Release_Process_副本_02(1).png

Efficiency comes from automation.

Consistency is protected by controlled checkpoints.

图片.png
EFD30_Final_Inspection_and_Release_Process_副本_02(2).png

Controlled Transfer Between

Production Stages

Products are transferred from production trays into

organized handling trays. Separation and consistent

orientation make subsequent inspection easier and provide

clearer access to terminal pins, winding leads and core

edges.

efd30-controlled-product-transfer.webp
EFD30_Final_Inspection_and_Release_Process_副本_03(1).png

Electrical Verification Before

Final Release

Electrical parameters are verified with a dedicated fixture

before the products proceed to subsequent inspection,

marking and packing. Consistent fixture positioning

supports repeatable checks against the applicable

inspection requirements.

图片111
EFD30_Final_Inspection_and_Release_Process_副本_04(1)


Dedicated fixture used for controlled electrical verification.

EFD30_Final_Inspection_and_Release_Process_副本_04(2).png

Visual Integrity After Soldering

and Handling

After terminal soldering and product transfer, the

assembly condition is checked again. Inspection focuses

on core-edge condition, terminal completeness and

alignment, tape condition, and overall product integrity.

1
ORGANIZED TRAY REVIEW
2
CORE-EDGE REVIEW
3

TERMINAL CONDITION REVIEW

_副本_05(2).png

 

Tray Arrangement Is Part of

the Inspection Process

Tray arrangement serves a quality-control function rather

than a presentation purpose. Consistent orientation makes

visual comparison easier, helps identify irregularities,

and prepares the batch for subsequent marking.

11.png
EFD30_Final_Inspection_and_Release_Process_副本_06(2).png
EFD30_Final_Inspection_and_Release_Process_副本_06(1).png

Double-Layer Tape Application

Is Verified

Similar-looking assemblies can differ in tape-layer

execution. A side-by-side reference helps verify the

required two-layer application, tape coverage, overlap and

edge position before the product proceeds to marking.

_副本_07(2).png

Marking Is Checked Before

Packing

Before packing, product markings are reviewed for

presence, legibility and format consistency. Missing,

incomplete or unclear characters are identified before

the products enter the final packing stage.

111
222
EFD30_Final_Inspection_and_Release_Process_副本_08(1).png

Packing Begins Only After the

Checks Are Complete

Products that complete the required checks are placed in

protective trays and packed in an orderly orientation.

The tray format keeps units separated and helps protect

terminals during subsequent handling.

图1
图3
e092c4a564ebc2b4f5e4add983b3bb60
_副本_09(2).png

ONLINE MESSAGE

WhatsApp:+86 152 6187 0271
Email : shiyucao@inftechs.com
Add :  Building A1, No. 55 Runfa Road, Jiangning District, Nanjing, China

EMC/EMI Components

Power Inductors & Transformers

Copyright © 2026 Nanjing Infinity Technology Co., Ltd. All Rights Reserved. Sitemap. Privacy Policy.  苏ICP备2022036817号-2